Monday, June 7, 2010

Fw: A good day of work done!

It's 5:00 and we have finished a full day of work.  When we arrived today we began work on the interior exterior and the grounds.  On the back of the building we built a stair to allow access to the exit door, finished insulating the exterior, and troweled on a first layer of morter over a layer of fiberglass mesh.  In the front room (same room the reception was held in last night) we removed the four windows and installed foam insulation on two of the thee exterior walls.  On the grounds we removed all the garbage and stacked the useable material in accessible places out of the way of construction.  Only a few minor cuts and bruises.  Lunch today was a romanian dish.  It was a cabage roll filled with meat and rice.  They tasted very good but we were all a little nervous about what they might do to our digestive track.  We plan to return after supper to do as much as possible before we run out of steam.  We know our time is limited and we want to accomplish as much as possible.

-- Sent from my Palm Pre

No comments:

Post a Comment